10 Aragon Ave · Coral Gables, FL 33134

Ten Aragon Condo

16-story tower, completed 2004, 183 residences in Coral Gables.

Tell me your unit and I'll prepare its value myself, from Ten Aragon Condo's closed sales and what is listed now. Then we talk it through.

Phone or email. One is enough.

Thinking about

Goes to Enrique only. No mailing list.

When a unit at Ten Aragon Condo lists or sells, I'll let you know. I send these myself, not a robot.

Phone or email. One is enough.

Alerts for

Goes to Enrique only. No mailing list.

At a glance Ten Aragon Condo (10 Aragon Ave, Coral Gables) is a 16-story, 183-unit building completed in 2004. FEMA flood zone X. Source: Miami-Dade Property Appraiser and MLS building records, and the FEMA flood map.

6 photos from my condo archive

Built
2004
Floors
16
Residences
183
Flood zone
XFEMA

MLS via Bridge IDX · as of Nov 2, 2026 · How these numbers are made

The read on Ten Aragon Condo.

Ten Aragon Condo rises 16 floors at 10 Aragon Ave in Coral Gables and was completed in 2004. 183 residences are on record for the building. MLS and county records use the legal name Ten Aragon Condo.

Sources: Miami Assoc. of REALTORS® MLS via Bridge IDX, Miami-Dade Property Appraiser records and my condo archive. Blanks mean the record doesn't state it; nothing here is estimated.

The record 8 facts

The record

Address
10 Aragon Ave, Coral Gables 33134
Neighborhood
Coral Gables
Front desk / mgmt
(305) 444-9665
Year built
2004
Floors
16
Residences on file
183
Recorded MLS listings
0
Recorded as
Ten Aragon Condo

The file on Ten Aragon Condo.

The rules on record, the documents in my files, the two Florida checks every buyer should run, and the buildings around it. Each card opens.

FEMA flood zone

X

Outside FEMA's Special Flood Hazard Area. Flood insurance is optional, and still worth pricing.

What the zone means
  • Minimal flood hazard on FEMA's current map.
  • The zone is a map line, not a premium. Ask the association for its master flood policy, and get a flood quote for the specific unit before you commit.

FEMA National Flood Hazard Layer, checked at the building's mapped location on Oct 12, 2026. Open the official map ↗

Milestone structural inspection

Due 2034

Due by statute by December 31, 2034, 30 years after 2004, then every 10 years.

What the deadline means
  • Miami-Dade sets 25 years for condo buildings within three miles of the coastline, which would be December 31, 2029.
  • Based on year built 2004 (MLS record). The statute counts from the certificate of occupancy date, which can differ.
  • The association must give every owner the inspector's summary. Ask for it, and for the structural integrity reserve study, before you commit.

Fla. Stat. § 553.899(3) ↗ and Miami-Dade recertification ↗, read Oct 9, 2026. What the deadline means for buyers

Nearby

Around Ten Aragon Condo

5 more nearby

Compare with the two nearest →Every Coral Gables building →Distances are straight-line. Building data from Miami Assoc. of REALTORS® MLS records via Bridge IDX.

Own here, or looking here

Owners: tell me your unit and I'll prepare its value myself. Buyers and renters: I'll tell you when a unit here lists or sells. Either way it starts a conversation with me, not a mailing list.

Own here?

Get your unit's value

Tell me your unit and I'll prepare its value myself, from Ten Aragon Condo's closed sales and what is listed now. Then we talk it through.

Phone or email. One is enough.

Thinking about

Goes to Enrique only. No mailing list.

Looking here?

Get alerts when a unit lists or sells

When a unit at Ten Aragon Condo lists or sells, I'll let you know. I send these myself, not a robot.

Phone or email. One is enough.

Alerts for

Goes to Enrique only. No mailing list.

Enrique Ponte Ojeda on a balcony overlooking the water in Miami
I read the building before you buy or sell a unit in it.Closed history, the association's rules, what is really for sale and what it should trade at. Then we talk.
Enrique Ponte Ojeda
Licensed Florida Real Estate Agent · Carmona Realty Group