Pre-construction · 535 Santander Ave, Coral Gables, FL 33134

The Village at Coral Gables

Pre-construction by MG Developer, 48 residences over 4 floors, delivery 2026.

At a glance The Village at Coral Gables (535 Santander Ave, Coral Gables) is a pre-construction condominium planned with 48 residences over 4 floors. The developer lists delivery in 2026. Source: developer-published figures from my pre-construction files.

13 developer renderings from the sales gallery. The finished product can differ.

Delivery
2026
Status
Topped Off
Floors
4
Residences
48
Developer
MG Developer
Architect
De La Guardia Victoria Architects & Urbanists
Mix
2 to 4 Bedrooms

Developer-published figures, from my pre-construction files

The project, decoded.

Status, the build, the rental rules and the deposit schedule as the developer publishes them, cross-checked against the MLS.

Pre-construction intel

Status & delivery

Topped Off

Est. completion
2026
Price sheet
On file, ask me

Delivery dates are developer estimates and slip more often than they hold. I track the actual construction milestones.

The build

Floors
4
Residences
48
Mix
2 to 4 Bedrooms
Ceilings
10 Ft
Balconies
11 Ft deep
Developer
MG Developer
Data
Developer-verified

Rental rules

Short-term / Airbnb
Not allowed
Minimum lease
12 months
Leases per year
1

Deposit schedule

  1. 40% at Contract
  2. 60% at Closing

What The Village at Coral Gables comes with.

Amenities 5 listed

  • Business Center
  • Social Lounge
  • Club Room
  • Gym
  • Resort-Style Pool

The developer

MG Developer

The sales gallery works for the developer (sales by One Sotheby's International Realty). I work for you. Same prices, same inventory, but the diligence, the negotiation and the read on this project against every other one in the pipeline are yours.

Represent me here

The read on The Village at Coral Gables.

The Village at Coral Gables is a pre-construction condominium at 535 Santander Ave in Coral Gables, planned with 48 residences over 4 floors. The developer lists its status as topped off and completion in 2026. It was developed by MG Developer and designed by De La Guardia Victoria Architects & Urbanists. Residences range across 2 to 4 bedrooms, with 10 ft ceilings.

The deposit schedule on file: 40% at contract, 60% at closing. Rental rules as published: no short-term rentals; minimum lease 12 months; up to one lease a year. Five amenities are listed, among them business center, social lounge and club room. I have seven developer documents on file for it, including the brochure.

Sources: Developer-published project data and my pre-construction files. Blanks mean the record doesn't state it; nothing here is estimated.

The record 12 facts

The record

Address
535 Santander Ave, Coral Gables 33134
Neighborhood
Coral Gables
Developer
MG Developer
Architect of record
De La Guardia Victoria Architects & Urbanists
Residence mix
2 to 4 Bedrooms
Ceilings
10 Ft
Expected delivery
2026
Status
Topped Off
Floors
4
Residences planned
48
Short-term rentals
Min lease 12 months
Sales by
One Sotheby's International Realty

The free project brief

For The Village at Coral Gables I'll pull the developer's current price sheet, the deposit structure and what is actually still available, and give you a straight read against the rest of the pipeline. Free, usually same day.

Enrique Ponte Ojeda on a balcony overlooking the water in Miami
I read the building before you buy the unit.The sales gallery works for the developer. I work for you, at the same prices.
Enrique Ponte Ojeda
Licensed Florida Real Estate Agent · Carmona Realty Group

What you'll get back

  • The price sheet and deposit schedule, as published today.
  • Real availability: which lines are left, and which are assignments.
  • The honest read on this project against the rest of the pipeline.
Call / Text786-578-6900 Emaileponteojeda@gmail.com
BuildingThe Village at Coral Gables, 535 Santander Ave, Coral Gables 33134